Skip to content
Telangana Social

Sarcasm as a Social Service. The SaaS Telangana didn’t ask for but needs.

Talk to us

Today's talking point

the Assembly gate clash

Analysis

Singur plan: 40 MGD, pending reality

HMWSSB is preparing alternatives for a possible reduction in Hyderabad’s Singur supplies. The water is not being diverted yet.

By Ctrl Alt DebatePublic ServicesHyderabad
WhatsApp
A huge capped pipe marked 40 MGD lies beside a stamped preparation plan while a small tap produces only a drip near a dry Hyderabad reservoir landscape.

The contingency plan is ahead of the water.

Illustration generated from an editorial brief

Public services | Analysis

Hyderabad’s water board is preparing for a possible reduction in Singur supplies if rainfall remains inadequate. HMWSSB Managing Director K. Ashok Reddy has directed officials to draw up alternatives, according to a press release reported by Telangana Today.

The plan includes examining an additional 40 million gallons per day through Mission Bhagiratha, identifying areas that may receive less Singur water and considering temporary vertical treatment plants along the Osman Sagar and Himayat Sagar conduit routes. Officials were also told to monitor reservoir levels, supply timings, low-pressure complaints and delays daily.

The important verb is “prepare”. The 40 MGD is not documented as being diverted, and the treatment plants are only proposed “if necessary”. A June report said pipeline work linked to the additional 40 MGD was pending. HMWSSB has not publicly disclosed current Singur storage, affected neighbourhoods or an implementation date. Hyderabad has a contingency plan; it does not yet have the water described in it. Mission accomplished remains a little early.

More stories

Editorial standards